Recent Projects

  • Toppino Stock Island Marina Village ContractorStock Island Marina Village
    General Contractor
    Project consisted of the construction of a high end marina complex complete with infrastructure for future development. Stock Island Marina Village is located on Stock Island and has received many awards and accolades for its level of hospitality and service.
    http://stockislandmarina.com/

  • Toppino Heritage Trail ContractorKey Haven to Big Coppitt Heritage Trail
    General Contractor
    Project consisted of the construction of over 3 miles of bike path, with concrete retaining walls and landscaping. The trail offers direct access to many points of interest in and provides safe passage for pedestrians looking to see what the Keys has to offer.
    http://www.dep.state.fl.us/gwt/state/keystrail/_default.htm

  • Toppino Sugarloaf Wastewater System SubcontractorSugarloaf Wastewater System
    Subcontractor
    Project consisted of the installation of over 22,000 linear feet of sewer pipe in the Sugarloaf area, as well as over 8,000 linear feet of water lines. This project was a portion of the Cudjoe Regional Wastewater Collection System, aimed at reducing the environmental impact of wastewater collection in the Keys.
    http://cudjoewastewater.com/

  • Toppino Oceanside Marina Demolition ContractorOceanside Marina Complex  Demolition
    General Contractor
    Project included the demolition of over 50,000 SF of commercial buildings and structures on the marina complex, which was self-performed by Charley Toppino and Sons.

  • Toppino Key West Hotel Collection SubcontractorKey West Hotel Collection Projects
    Subcontractor
    Project consisted of demolition, underground utilities, and earthwork at 4 sprawling hotel sites on Roosevelt Blvd in Key West. Charley Toppino and Sons was able to provide site development services to each of the 4 hotel sites within the collection.
    http://www.gateshotelkeywest.com/

  • Toppino City of Key West Fire Station SubcontractorCity of Key West Fire Station #2
    Subcontractor
    Project consisted of the installation of drainage systems, injection well, utilities and earthwork. The City of Key West Fire Station #2 was official opened in January of 2014.
    https://www.cityofkeywest-fl.gov/

  • Toppino CVS SubcontractorCVS Stock Island
    Subcontractor
    Project consisted of the installation of over 22,500 Tons of fill material, as well as underground utilities and concrete flatwork.
    http://www.cvs.com/

  • Toppino FDOT Summerland Key Drainage ContractorFDOT Summerland Key Drainage Project
    General Contractor
    Project consisted of the installation of over 3,000 linear feet of drainage systems, 1,200 tons of asphalt paving on US1 and concrete flatwork.
    http://www.dot.state.fl.us/

  • Toppino FKCC Marine Technology Building Demolition ContractorFKCC Marine Technology Building Demolition
    General Contractor
    Project consisted of the demolition of an 8,000 SF concrete structure and removal of over 4,000 tons of fill material and demolition debris.
    https://www.fkcc.edu/

  • Toppino Spanish Harbor Heritage Trail ContractorDEP: Spanish Harbor Heritage Trail Project
    General Contractor
    Project consisted of the construction of over 9 miles of bike path, with concrete retaining walls and landscaping. The trail offers direct access to many points of interest in and provides safe passage for pedestrians looking to see what the Keys has to offer. http://www.dep.state.fl.us/gwt/state/keystrail/_default.htm

  • Toppino Simonton Street Emergency Outfall ContractorNorth Simonton Street Emergency Outfall
    General Contractor
    Project consisted of electrical system upgrades and the installation of over 300 linear feet of 36” PVC storm pipe. The system was added to diminish storm water impacts in the Simonton/Front street area. https://www.cityofkeywest-fl.gov/

  • Toppino Southernmost Cabana Resort SubcontractorSouthernmost Cabana Resort Project
    Subcontractor
    Project consisted of the installation of a complete sewer system and water system, as well as earthwork and grading. http://southernmostcabana.com/

  • Toppino Tarpon Harbour SubcontractorTarpon Harbour Project
    Subcontractor
    Project consisted of the installation of over 20,000 tons of fill material, and the installation of fire, water and sewer systems for the development.
    http://www.tarponharbourapts.com/